Previous 4 Fiscal Years (Lines)
ODOT projects from the previous four fiscal years, shown as the stretches of road they ran along. It records what was on the program rather than what was delivered — cancelled projects, and ones never filed, are in here too.
- Published by
- ODOT Office of Transportation and Economic Development, ELLIS Program
- Source
- Ohio Department of Transportation TIMS
- Original data
- tims.dot.state.oh.us
- Terms of use
- Public information, no warranty (ODOT)
- On the map
- Lines
Ask State Planner a question about this data in plain language, and get the answer as a written explanation and a map.
Sign up to askFields
What each record holds, as the publisher describes it: 70 fields.
| Field | Description |
|---|---|
ObjectID OBJECTID | |
GIS_ID | GIS ID used for processes within TIMS application |
PID_NBR | PID Number |
DISTRICT_NBR | From 1-12 plus Central Office – the counties are grouped into districts in Ohio for ease of maintenance and funding |
LOCALE_SHORT_NME | The 3-letter code of the county within Ohio (88 counties total) - Or indicates district with three digits (i.e. D12) |
COUNTY_NME | County of record for the project as recorded in ELLIS |
PROJECT_NME | Name of the project - County and route in title |
CONTRACT_TYPE | Indicates the contract type of the project. Design Build 1, Emergency A, Emergency B, Emergency C, or Standard Build |
PRIMARY_FUND_CATEGORY_TXT | Indicates the primary category from which the funds come from |
PROJECT_MANAGER_NME | Name of the project manager |
RESERVOIR_YEAR | Reservoir year |
TIER | Tier 1, Tier 2, Tier 3, or NULL |
ODOT_LETTING | Indicates Letting responsibility. ODOT or Local |
SCHEDULE_TYPE_SHORT_NME | Indicates the scheduling type. I.e. how long of a bid. |
ENV_PROJECT_MANAGER_NME | Environmental project manager name |
AREA_ENGINEER_NME | Area Engineer name |
PROJECT_ENGINEER_NME | Project engineer name |
DESIGN_AGENCY | Indicates the agency whom is responsible for project design |
SPONSORING_AGENCY | Indicates the sponsoring agency |
PDP_SHORT_NAME | Short name for ODOT's Project Devlopment Process |
PRIMARY_WORK_CATEGORY | Indicates what actual work is being done |
PROJECT_STATUS | Status of the procject. Awarded, Cancelled, Filed, Not Filed. |
FISCAL_YEAR | Fiscal year |
INHOUSE_DESIGN_FULL_NME | Full name of the in-house designer |
EST_TOTAL_CONSTR_COST | Estimated total construction cost |
STATE_PROJECT_NBR | State project number |
CONSTR_VENDOR_NME | Name of construction vendor |
STIP_FLAG | Flagged for the Statewide Transportation Improvement Program (Y/N) |
CURRENT_STIP_CO_AMT | Current statewide transportation improvement program cost amount |
PROJECT_PLANS_URL | Project plans URL |
PROJECT_ADDENDA_URL | Project agenda URL |
PROJECT_PROPOSAL_URL | Project proposal URL |
FMIS_PROJ_DESC | Project description as approved by federal highway at time of first project authorization |
AWARD_MILESTONE_DT | Date project was awarded |
BEGIN_CONSTR_MILESTONE_DT | Date construction began |
END_CONSTR_MILESTONE_DT | Date construction ended |
OPEN_TRAFFIC_DT | Date open to traffic |
CENTRAL_OFFICE_CLOSE_DT | Date central office has verified that all commitments have been completed and has closed with applicable agencies |
SOURCE_LAST_UPDATED | Field used for internal purposes tracking when the source data was last updated |
COD_LAST_UPDATED | Internal field used to track db updates |
PRESERV_FUNDS_IND | Indicator of whether the project includes committed District preservation funds |
MAJOR_BRG_FUNDS_IND | Indicates bridge funds (Y/N) |
MAJOR_NEW_FUNDS_IND | Indicates new funds (Y/N) |
MPO_FUNDS_IND | Indicates MPO funds (Y/N) |
SAFETY_FUNDS_IND | Indicates safety funds (Y/N) |
LOCAL_FUNDS_IND | Y/N Indicates local funds |
OTHER_FUNDS_IND | Indicates other funds (Y/N) |
NLF_ID | Primary key field that is the basis for identifying unique roadway segments in ODOT's graphic roadway network. The attribute is made up of seven components that describe administrative and other characteristics related to a route segment; Positions (1) - Jurisdiction, (2 thru 4) - County Code, (5 thru 6) - Route Type, (7 thru 11) - Route Number, (12) - Extension Code, (13) - Description Code, (14) - Direction Code; For further definitions of codes, please refer to the Roadway Information Manual |
CTL_BEGIN | Beginning County Log Point of the section of the route |
CTL_END | Ending County Log Point of the section of the route |
GIS_FEATURE_TYPE | Indicates the GIS feature type |
ROUTE_TYPE | Two letter code indicating the basic transportation grouping or system that the route belongs to - third component of the NLFID; For further definitions of codes, please refer to the Roadway Information Manual |
ROUTE_ID | Route number associated with the section of the route |
STRUCTURE_FILE_NBR | Unique 7 digit identifier for all bridges |
MAIN_STRUCTURE_TYPE | Denotes the material, overall type, and the special design configuration of the main supporting members of the superstructure |
SUFFICIENCY_RATING | Sufficiency Rating of the the structure. Reference SMS Bridge Inventory Coding Guide for detailed breakdown for codes |
OVRL_STRUCTURE_LENGTH | Length of structure |
DECK_AREA | Calculated field derived from bridge roadway width and deck width |
DECK_WIDTH | Width of the deck |
FEATURE_INTERSECT | Feature that a bridge goes over – road, stream, etc. |
YEAR_BUILT | Year bridge was installed |
LONGITUDE_BEGIN_NBR | Longitude of begin point in decimal degrees |
LATITUDE_BEGIN_NBR | Latitude of begin point in decimal degrees |
LONGITUDE_END_NBR | Longitude of end point in decimal degrees |
LATITUDE_END_NBR | Latitude of end point in decimal degrees |
COUNTY_CD_WORK_LOCATION | County code for which the project location exists |
COUNTY_NME_WORK_LOCATION | County name in which the project location exists |
DISTRICT_WORK_LOCATION | ODOT District in which the project is located |
PAVEMENT_TREATMENT_TYPE | Type of pavement treatment if applicable to project work location record |
PAVEMENT_TREATMENT_CATEGORY | Category of pavement treatment if applicable to project work location record |